Erenkoy - Kümbet Mines & Works
Erenkoy - Kümbet Mines & Works
Here in the heart of Turkey, with our friends from Akdeniz Mineral Kaynakları A.S. (a part of Grecian Magnesite since 1993), we operate three adjacent open pit mines (Sazlik, Eldizen & Aktepe) to extract premium quality magnesite. The RoM material goes through pre-beneficiation on site and then travels 5km to the main plant in Erenköy, where it is crushed, screened at various size fractions, washed and dried, before going through different beneficiation processes -magnetic separation, sensor-based sorting- depending on the desired chemistry of the kiln-feed magnesite.
At Erenköy and Aktepe/Sazlik, 3 grizzlys, 2 drum magnet lines, four magnetic separation lines, 2 hand-sorting lines and 1 X-ray-based sorting line and drying unit, produce kiln-feed magnesite, that goes to the calcination plant in Kümbet, 10Km away, to be fired at ~900oC in 1 rotary and 2 shaft kilns with a calcination capacity of 100 tpd. The caustic calcined magnesia RoK is then further crushed, milled and classified to order at the CCM final processing plant.